Computers OverClocked Forums Computers OverClocked
"Not just another computer help website."

FAQ Search Upgrade Register
Favorite Threads Private Messaging Login

Menu
Forums
RegisterRegister
Over Clocking Guide
Over Clocking Help
Computer Building Help
Virus/Security Alerts
Broadband Tweaks
Computing Guides
Featured Hot Deals
Reviews
Tools


Top 25 reasons to register!

Advertise your link here for $19.99/month!

 
 Computers OverClocked Welcomes You!
 Date/Time is Mon Oct 23, 2017 7:39 am
 Computer Photo Gallery
Computing News Headlines:
New HTC Android Phones Tweaked to Evade Apple Patents
Ivy Bridge Temperatures – It’s Gettin’ Hot in Here
Adobe CS6 on sale today, Creative Cloud coming May 11th

Summer irrigation work into the climax
Post new topic Reply to topic Computers OverClocked Forums - Build a Computer - Computer Building Help All times are GMT - 5 Hours - EDT
Author Message
quangongzi
Member



User is offline 
Send private message
Joined: Aug 15 2016
Posts: 2354

PostPost subject: Summer irrigation work into the climax
Posted: Mon Mar 20, 2017 11:20 pm
Reply with quote

In recent years, pavement irrigation technology as an effective preventive conservation methods have been generally accepted by local road maintenance departments. Asphalt pavement used in the material is called pouring glue. Grouting glue is usually used rubber modified asphalt filling material, that is, rubber asphalt filling glue. At present, the domestic use of pouring glue from a wide range of quality, uneven quality, the use of the effect is not ideal, especially low temperature performance is generally poor, a lot of pouring glue to the winter that is cracked with the cracks wall, lost the waterproof effect. Moreover, China has no relevant technical specifications can be used to evaluate the performance of filling glue, to give inferior opportunities to take advantage of the product.
The main contents of the standard include rubber asphalt filling glue basic requirements, technical requirements, test methods, inspection rules, labeling, packaging, transportation and storage. The standard is classified according to the minimum applicable temperature of rubber asphalt pouring glue products, which are high temperature type, ordinary type, low temperature type and cold type, and stipulate the corresponding technical requirements. Standard for rubber asphalt poured out of a complete test methods, including low temperature tensile test, cone penetration test, softening point test, flow test and elastic test and other five tests, and test equipment, test procedures and evaluation indicators to make The detailed provisions.
The company's production of road filling glue in strict accordance with the national transport industry standards, the company's main: pouring glue, anti-cracking stickers, paste sewing belt and other products in recent years in China's highway pavement conservation project has been rapidly promoting the application.
amazon foam roller trigger point
asphalt cement printing
paver finisher manufacturer
aggregate chip spreader on road
_________________
Road Repair Machines
Back to top
 Rate Post
View previous topic :: View next topic  
Post new topic Reply to topic Computers OverClocked Forums - Build a Computer - Computer Building Help Page 1 of 1


Similar Topics
Topic Author Forum Replies Posted
No new posts if your visitors can get the day off ... misshuana Broadband Tweaks, Tips and Optimization 0 Mon Oct 23, 2017 3:59 am View latest post
No new posts printing work with the various languages kjh8901 phpBB mods 0 Mon Oct 09, 2017 3:43 am View latest post
No new posts 2017| Affordable Nike Zero cost Work ... Toma Operating Systems 0 Fri Sep 29, 2017 9:37 pm View latest post
No new posts ing the summer. The reigning Hob riluowanying123 Over Clocking and Mods 0 Fri Sep 29, 2017 3:53 am View latest post
No new posts currently gives your bigger preview f... Katherine Gibbons The General Store 0 Wed Sep 27, 2017 11:08 pm View latest post